Oil & gas
No photograph on file
LUKOIL
Adamtash–Gumbulak–Jarquduq Gas Condensate Fields
Electrical installation works for the development of the Adamtash, Gumbulak and Jarquduq–Yangi Qizilcha gas condensate fields.
Electrical installation works at the new gas treatment unit and booster compressor station facilities of the Urga field (Petronas Carigali), for ERIELL Corporation.
This entry is taken from the NASAF ELEKTROMONTAJ qualification document. Technical figures (voltage, capacity, cable length) are not given in that document and are therefore not stated here.
Electrical installation works for the development of the Adamtash, Gumbulak and Jarquduq–Yangi Qizilcha gas condensate fields.
Electrical installation and cathodic protection works for the condensate pipeline expansion at the Khauzak–Dengizkul field.
Capital overhaul of the 10 kV overhead power lines at Gissar-1 and Gissar-2 for LUKOIL.