NASAFELEKTROMONTAJ
Discuss a project

Electrical infrastructure built for continuous operations

NASAF ELEKTROMONTAJ delivers substations, cable systems and industrial power networks from design through commissioning. Oil and gas, industrial, defence and public facilities across Uzbekistan, backed by our own electrical laboratory.

SLD · 110 / 35 / 10 kVNASAF · ELEKTROMONTAJ
Single-line diagram of a substationA 110 kV busbar with four outgoing bays: 110 kV, 35 kV, 10 kV and the electrical test laboratory.110 kV110 kV35 kV10 kVLAB
CIRCUIT DIAGRAMSHEET 01 / 01
Schematic: 110 / 35 / 10 kV network and the test laboratory.
24Documented reference projects
2007–2022Documented project record
110 kVElectrical laboratory
ISO 9001 · 14001 · 45001Certifications and licences

The full electrical infrastructure cycle

Design, procurement, installation, testing and maintenance — under one line of responsibility.

7 · Services110 kV · Electrical laboratory
01

Substation construction

New capacity needs connecting, or an ageing substation no longer carries the load. We take it from design through commissioning.

  • Transformer substations — 110 / 35 / 10 kV
  • Relay protection and automation systems
  • Dispatch control and SCADA integration
Voltage range
110 / 35 / 10 kV
Details
02

Cable systems

Power has to move reliably between facilities — underground or overground, including in difficult ground conditions.

  • Cable lines up to 110 kV
  • Underground routes and crossings
  • Cable joints and terminations
Voltage range
110 kV
Details
03

Industrial electrification

Connecting a new production line or a whole plant — from distribution boards through to lighting.

  • Internal and external power supply networks
  • Switchgear and distribution boards
  • Power factor correction equipment
04

Electrical laboratory

You need the actual condition of equipment established — before energising, or as part of routine monitoring.

  • Transformer diagnostics
  • Cable line testing
  • Relay protection device verification
Voltage range
110 kV
Details

We carry the project end to end

No separate contractor for each stage — engineering, procurement and testing sit in one team.

6 · Project lifecycle

Capabilities
  1. Technical assessment

    Site survey, establishing the existing network and the requirements.

    Survey report
  2. Engineering

    Calculating the solution, preparing schematics and design documentation.

    Design documentation
  3. Procurement

    Selecting, purchasing and delivering equipment and materials to site.

    Equipment specification
  4. Installation

    Work on site, carried out under the applicable safety procedures.

    Completion certificate
  5. Testing & commissioning

    Electrical laboratory testing, adjustment and verification under load.

    Test protocols
  6. Handover & support

    Documentation handover, client briefing and ongoing maintenance.

    As-built documentation

Completed work

24 projects from the company qualification document, each with client, year and location.

24 · Documented reference projects2007–2022
Suzuk Ota Complex Construction
Tashkent engineering company

Suzuk Ota Complex Construction

Electrical installation works for the construction of the Suzuk Ota complex in the Shaykhontohur district of Tashkent.

Public facilities2018Tashkent, Shaykhontohur
Nurullaboy Palace Complex Restoration
Directorate for the Protection of Architectural Monuments

Nurullaboy Palace Complex Restoration

Electrical installation works as part of the restoration of the Nurullaboy complex in the Khiva district, Khorezm region.

Public facilities2017Khiva, Khorezm

Experience by sector

Project counts per sector come from the documented project list.

6 · Sector17 · Client

Discuss your project with an engineer

Send a specification, a drawing or a short description — our engineering team will review it and respond.