Safety is part of the deliverable

On high-voltage work, safety is not a separate section — it is the method of working. The system in force is set out below.

Management system
4
Practice on site
6

Management system

4 · ISO

ISO 45001:2018

Certified occupational health and safety management system. The document is viewable in full in the certifications section.

ISO 9001:2015

Quality management system — how work is checked and documented.

ISO 14001:2015

Environmental management system — environmental requirements on site.

State licence

The licence covers the design, construction and operation of high-hazard and potentially dangerous production facilities. The full scope is published in the Certifications section.

Practice on site

6 · Practice on site
  • Isolation and tagging

    Before work starts the supply is isolated, proven dead and earthed. The tagging sequence is not broken.

  • Personal protective equipment

    Arc-flash protection, dielectric equipment and work-at-height gear, matched to the task.

  • Site induction

    A hazard briefing is delivered on every site before work begins.

  • Procedure during testing

    High-voltage testing areas are barriered, with access restricted to authorised personnel.

  • Equipment control

    Measuring instruments and protective equipment are checked on a regular schedule.

  • Documentation

    Work carried out and test results are recorded in formal protocols.

Safety performance figures (incident-free hours, LTIFR and similar statistics) are not published until confirmed by the company.