NASAFELEKTROMONTAJ
Discuss a project
Industrial

Tashkent Metallurgical Plant Construction

No photograph on file

Work performed by NASAF

Electrical installation works for the construction of the Tashkent Metallurgical Plant.

This entry is taken from the NASAF ELEKTROMONTAJ qualification document. Technical figures (voltage, capacity, cable length) are not given in that document and are therefore not stated here.

Reference projects

Completed work

Industrial
No photograph on file
Andijontaʼmirqurilish

DAMAS Passenger Car Production Line

Electrical installation works for setting up DAMAS passenger car production in the Khorezm region.

2014Khorezm
Industrial
No photograph on file
Avtosanoat-injiniring (Uzavtomotors)

Damas & Labo Body-Stamping Production Facility

Electrical installation works for the Damas and Labo car body-stamping production facility at the Uzavtomotors branch site in Pitnak.

2021Pitnak, Khorezm
Industrial
No photograph on file
TREST-12

GM Powertrain Uzbekistan Engine Plant

Electrical installation works for the construction of the General Motors Powertrain Uzbekistan engine plant. General contractor: TREST-12.

2011Tashkent Region