No photograph on file
Andijontaʼmirqurilish
DAMAS Passenger Car Production Line
Electrical installation works for setting up DAMAS passenger car production in the Khorezm region.
Construction of 6 kV inter-site networks on 110 kV structures at the Khandiza underground mine, Surkhandarya region. General contractor: Almalyk MMC.
This entry is taken from the NASAF ELEKTROMONTAJ qualification document. Technical figures (voltage, capacity, cable length) are not given in that document and are therefore not stated here.